You get a vector of integers piles and an integer h. Pile i holds piles[i] bananas. Koko has h hours to eat all n piles.
Return the slowest whole-number speed k at which she finishes every pile within h hours.
At speed k, she eats up to k bananas each hour, from a single pile. If that pile has fewer left, she finishes it and waits for the next hour. So a pile of p bananas takes p / k hours, rounded up.
Example 1:
Input: piles = [5,9,2], h = 6 Output: 3 Explanation: At speed 3 the piles take 2 + 3 + 1 = 6 hours, just enough. At speed 2 they would take 3 + 5 + 1 = 9 hours.
Example 2:
Input: piles = [8,15,4], h = 3 Output: 15 Explanation: 3 piles in 3 hours means one hour per pile. The biggest pile has 15 bananas, so the speed must be 15.
Example 3:
Input: piles = [12], h = 5 Output: 3 Explanation: At speed 3 the only pile takes 4 hours, within the 5. At speed 2 it would take 6.
Constraints:
- 1 to 10,000 piles.
- Each pile has 1 to 109 bananas.
his at least the number of piles and at most 109.
Note:
Your algorithm should run in O(n log m) time, where m is the biggest pile, and use O(1) extra space.
At a slow speed, the hours add up fast. At speed 1, 104 piles of 109 bananas take 1013 hours. That is far more than a 32-bit integer can hold.